Transportation & Mobility

Transportation is the foundation of the Hwy 278 CID Master Plan. The transportation strategy reimagines U.S. Highway 278 as a complete street—one that balances vehicular movement with pedestrian safety, aesthetics, and placemaking. Rather than serving solely as a route through the City of Covington, the corridor is envisioned as a destination that supports walkability, economic activity, and community life.

Transportation

Master Planning Intent

A complete street approach guides the rethinking of what U.S. Highway 278 is and should be. The new “Complete” 278 focuses on creating a pedestrian-friendly, aesthetically pleasing environment that enhances safety, accessibility, and overall corridor character.

Key Transportation Elements Include:

  • Wide medians designed to accommodate large, mature canopy trees

  • Wide tree lawns that improve pedestrian safety by separating sidewalks from travel lanes

  • A 12-foot-wide multipurpose sidewalk along the north side of the corridor that functions as a linear park and trail

  • Pedestrian-scaled street lighting with opportunities for seasonal or festive banners

  • Relocation of overhead utilities to the greatest extent practical

Replacement of signalized intersections with roundabouts where feasible

  • Interstate 20 to Piper Street
  • Piper Street to West side of Chick-fil-A
  • Chick-fil-A to Hospital Drive
  • Hospital Drive to Henderson Drive

A complete street approach guides the rethinking of what U.S. Highway 278 is and should be. The new “Complete” 278 focuses on creating a pedestrian-friendly, aesthetically pleasing environment that enhances safety, accessibility, and overall corridor character.

Key Transportation Elements Include:

  • Wide medians designed to accommodate large, mature canopy trees
  • Wide tree lawns that improve pedestrian safety by separating sidewalks from travel lanes
  • A 12-foot-wide multipurpose sidewalk along the north side of the corridor that functions as a linear park and trail
  • Pedestrian-scaled street lighting with opportunities for seasonal or festive banners
  • Relocation of overhead utilities to the greatest extent practical

Replacement of signalized intersections with roundabouts where feasible

Detailed transportation plans, cross sections, and technical documentation for this corridor segment are available through the project’s planning consultant.

View Detailed Transportation Plans Here

This segment of the Hwy 278 corridor reflects improvements that are typical of a Central Business District, where transportation, pedestrian activity, and storefront development work together to create an active and walkable environment.

Improvements in this section focus on supporting future commercial development, enhancing pedestrian comfort, and reinforcing a strong sense of place within the district.

Key Improvements Include

  • Wide sidewalks extending from the travel way to the face of future storefront developments
  • Tree wells located adjacent to the back of curb to support street trees within a dense urban environment
  • Landscaped medians that enhance aesthetics and help calm traffic
  • Pedestrian-scaled street lighting with opportunities for decorative or festive banners
  • Relocation of overhead utilities to improve visual quality and support future development
  • A roundabout at Emory Street to improve traffic flow, safety, and access within the district

Detailed transportation plans, cross sections, and technical documentation for this corridor segment are available through the project’s planning consultant.

View Detailed Transportation Plans

The Chick-fil-A to Hospital Drive segment continues the transformation of Highway 278 into a complete street while strengthening connections to the downtown core. This section balances enhanced pedestrian amenities, corridor landscaping, and traffic improvements that support both mobility and placemaking.

Improvements in this segment emphasize walkability, safety, and visual continuity while accommodating existing infrastructure constraints within the corridor.

Key Improvements Include

  • Wide medians designed to accommodate large, mature canopy trees where feasible
  • Wide tree lawns that improve pedestrian safety by separating sidewalks from travel lanes
  • A 12-foot-wide multipurpose sidewalk along the north side of the corridor functioning as a linear park and shared-use trail
  • Pedestrian-scaled street lighting with opportunities for decorative or festive banners
  • Selective relocation of overhead utilities, recognizing that transmission lines in this segment may limit feasibility; where relocation is not possible, enhanced shrubbery, small trees, and accent plantings may be used in place of large canopy trees
  • Direct connection to the Downtown Gateway, reinforcing arrival and identity
  • Three roundabouts at Pace Street, Elm/Alcovy Streets, and Mill Street to improve traffic flow, safety, and access

Detailed transportation plans, cross sections, and technical documentation for this corridor segment are available through the project’s planning consultant.

View Detailed Transportation Plans

The Hospital Drive to Henderson Drive segment marks the eastern portion of the Hwy 278 corridor and plays an important role in connecting transportation improvements to the East Gateway. This section continues the complete street framework while reinforcing corridor continuity, safety, and access.

Improvements in this segment focus on strengthening pedestrian infrastructure, enhancing landscaping, and improving traffic flow while supporting the overall identity and function of the corridor.

Key Improvements Include

  • Wide medians designed to accommodate large, mature canopy trees
  • Wide tree lawns that improve pedestrian safety by separating sidewalks from travel lanes
  • A 12-foot-wide multipurpose sidewalk along the north side of the corridor functioning as a linear park and shared-use trail
  • Pedestrian-scaled street lighting with opportunities for decorative or festive banners
  • Relocation of overhead utilities to support long-term corridor upgrades and improved aesthetics
  • Direct connection to the East Gateway, reinforcing arrival and corridor identity
  • Two roundabouts at Industrial Boulevard and State Route 142 to improve traffic flow, safety, and access

Detailed transportation plans, cross sections, and technical documentation for this corridor segment are available through the project’s planning consultant.